New shelf arrivals · Free shipping over $60 · Browse the stacks
Chapter ·

7F-074-012 M4 Shunters Truck 41046 Laira Down Side Tools When the line was absorbed

SKU 49045770611
4.2
EUR51.00 EUR76.00

Pay in 4 interest-free payments of $12.75 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 15 - Aug 20

Size: 4
Description

When the line was absorbed by the Southern Railway in 1923

Adjustable Tender Drawbar

Accurately –painted and –printed paint schemes

Complementary to OO scale model railways (1:76 scale)

7F-074-012 M4 Shunters Truck 41046 Laira Down Side Tools When the line was absorbedExpected Delivery August 2026 (Subject to Change at Manufacturer's Discretion). The M3 Shunters trucks came around in 1912 when modifications were made to the previous design of M2 shunters truck which included self contained buffers and non wrap around handrails. Roughly 41 of these were built with modifications between the batches like lamp irons, step supports and handrails changing. In 1920, the design was changed and became the M4 shunters truck

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products